Weekly brief encompasses a range of practices, policies and regulations to minimize hazards, prevent accidents, injuries and promote sustainable practices Back to News page
Author: Clement Leong
Annual audit strategy, obtaining evidence, completing testing, analysis & report
Annual audit strategy, obtaining evidence, completing testing, analysis & report Back to News page
Product Presentation on Green Mark Product for Ducting Air Ventilation System(PIR & Passive Displacement Ventilation)
Product Presentation on Green Mark Product for Ducting Air Ventilation System (PIR & Passive Displacement Ventilation) Public Work Department , Ministry of Development Negara Brunei Darussalam 2nd Floor BPB, Bilik Tetra, PWD Headquarters, Old Airport, Berakas Introduction of Local Company Base in Negara Brunei Darussalam Back to News page
Product Presentation on “EUROFLO” END Suction Centrifugal Pumps(For Chillers Chilled Water Pumps)
Product Presentation on “EUROFLO” END Suction Centrifugal Pumps (For Chillers Chilled Water Pumps) Public Work Department, Ministry of Development Negara Brunei Darussalam 2nd Floor BPB, Bilik Tetra, PWD Headquarters, Old Airport,Berakas Euroflo Pumps International Pte Ltd, Singapore Back to News page
SMARDT Oil Free Centrifugal Chiller in Brunei Darussalam
SMARDT Oil Free Centrifugal Air Cooled Chiller In Brunei Darussalam Unit installed since 2016 Proven cost saving on breakdown repairs & downtime Energy saving Unit status reported in full optimal performance after 3 years Back to News page
Repairing and coating Microchannel coil, Brunei International Airport
Repairing and coating Microchannel coil, Brunei International Airport Out of commission chiller for over 7 years, restored to functioning condition. Back to News page
PIR duct install at JPMC Hospital (Environment green)
PIR duct install at JPMC Hospital (Environment green) Back to News page
Checking Electrical panel by using Thermal Scanner
Checking Electrical panel by using Thermal Scanner Back to News page
Damaged Chiller Repair
Damaged Chiller Repair 10 years damaged chiller unit (reported as non fixable), being restored to full working condition by Chat Enterprise team. Back to News page
Bric AHU (VSD drive motor EC) install at Jpmc Jerudong, Brunei Darussalam
Bric AHU (VSD drive motor EC) install at Jpmc Jerudong, Brunei Darussalam Back to News page