SMARDT Oil Free Centrifugal Air Cooled Chiller In Brunei Darussalam Unit installed since 2016 Proven cost saving on breakdown repairs & downtime Energy saving Unit status reported in full optimal performance after 3 years Back to News page
Category: Projects
Repairing and coating Microchannel coil, Brunei International Airport
Repairing and coating Microchannel coil, Brunei International Airport Out of commission chiller for over 7 years, restored to functioning condition. Back to News page
PIR duct install at JPMC Hospital (Environment green)
PIR duct install at JPMC Hospital (Environment green) Back to News page
Checking Electrical panel by using Thermal Scanner
Checking Electrical panel by using Thermal Scanner Back to News page
Damaged Chiller Repair
Damaged Chiller Repair 10 years damaged chiller unit (reported as non fixable), being restored to full working condition by Chat Enterprise team. Back to News page
Bric AHU (VSD drive motor EC) install at Jpmc Jerudong, Brunei Darussalam
Bric AHU (VSD drive motor EC) install at Jpmc Jerudong, Brunei Darussalam Back to News page